Artist Without A Canvas Studio

The closing step — the dated written evaluation

The pilot ends with a dated written evaluation from the studio (the offer's §2 deliverable; its date is in the agreement, and the refund trigger in the offer's §4 is defined against it). So you know what your session is building toward, the evaluation contains:

  1. Your mapped schema, as built — your domain's declaration (founding schema, fact types, recipe pins) as it stood at the end of the pilot. Or, if the mapping failed: a written statement of exactly where the record layer failed to express your domain. Either result is a deliverable; a failed mapping is reported as a finding, not billed as a success.
  2. The ledger extract — every collapse run during the pilot: pin, position, parameters, content key, output hash, ledger sequence. The extract itself, not a summary of it; you can re-derive any line of it, during and after the pilot.
  3. The determinism evidence on your domain — the replay verdicts (the MATCH set), the two-clocks result if it was run, and the tamper test's outcome: the claim, the altered input, the REFUTED verdict.
  4. Findings — every place the layer's conventions pressed on your shape (the field DSL's limits, stream addressing, ruleset-as-data, the compiled-in registry), each stated as a finding with your workaround or the layer change it argues for.
  5. The guarantee page, as applied — which of your domain's surfaces sit on the decision path (byte-identical) and which, if any, are presentation surfaces (graded by stated measure).
  6. The refusals you met — each refusal your pilot triggered and what it protected.
  7. Terms and date — the conversion terms from your pilot agreement restated, the demand gate's state at the evaluation date, and the date itself, with the studio's name on it.

If you walked this guide before signing, you have already produced the raw material of items 1, 3, and 6 for the template domain. The session does the same work on yours.

— End of guide. Companion documents: pilot-offer-2026-11-22.md (the instrument this guide serves), api-product-spec-2026-11-22.md (the specification, §1.4 for the guarantees and the refusal law), third-domain-e4-prep-2026-11-22.md (the replay-verify build report, including findings 1–2 as recorded there).

← Troubleshooting